Products: Froth Pak
Froth Pak
Froth Pak
The FROTH-PAK kit comprises two pressurised tanks, linked by hoses, to a dispensing gun. When the contents of the two tanks are dispensed, they chemically react to produce a froth-like substance, which quickly expands to about three to five times the dispensed volume. The foam solidifies in about 60 seconds and fully cures into a solid permanent structure in approximately five minutes. Cured foam resists moisture, insulates, dampens noise, adds structural support, provides an air-seal and fills voids.
Froth-Pak is the best form of insulation available, because of its closed compact cellular structure.
Spray Froth-Pak onto any clean, dry surface in any direction to insulate, fill and seal various size voids, dampen sound or reduce vibration. It is specifically designed to spray onto flat or irregular surfaces, and to fill large cavities.
"Don’t want to spray it yourself then call us and we can arrange a contractor to apply your foam for you"
The Froth Paks are a great fire rated portable product, they are self pressurised and give machine quality closed cell spray foam. Ideal for any of your sprayfoam requirements. The kits come in various sizes, FP180 and the FP600. Using the Patented GHA applicator guns things could not be any simpler. Kits and lines are colour coded simply connect gun kit to the tanks, click in an anti crossover nozzle and create foam, spray, inject, glue or bond. Perfect for all applications and with the Froth Pak spray foam kits you are ensured perfect quality closed cell foam time after time. Minimal mess no contractors required and with the larger FP600 creating up to 50 Sq mtrs @ 25mm thick, larger jobs can be completed easily.
USES
- Insulation
- Spray foam insulation
- Under roof spray / sprayed on to membranes and direct onto prepared tiles
- Roof consolidation / Used as a replacement for cement torching to prevent tile and slate loss
- Condensation abatement / 15mm of foam onto corrugation stops condensation forming
- Marine insulation / Buoyancy
- Film and set construction
- Air-seal / Building air tightness
- Pipeline / Gas and oil industry
- Cold storage
![]() |
![]() |
![]() |
FP180 QR. Downloads |
FP600 QR. Downloads |
GHA9 Gun kit.
|
![]() |
![]() |
![]() |
GHA15 Gun kit. |
GHA30 Gun kit.
|
Manual transfer valves.
|
NS Nozzles
The clear/white nozzle gives spray finish ideal in most applications.
GG Nozzles
White/ blue nozzle gives fine fan pattern suitable for larger flat areas, steel containers, sarking, boarding ect.
Caulk and pour nozzles available on request.
Yield

Downloads:
For a larger version of the yield stats above and more detailed information regarding Froth Pak please see our Froth Pak brochure click here to download
For full instructions please download Froth Pak Instructions here
For quotation and supply contact Eco Polyurethane Systems Ltd. on 0800 38 78 77
Froth Pak - Videos
More Videos for Froth Pak
Spray foam kit/ Condensation problems solved
Storage Container Insulation/Condensation cure
Spray foam as a roofloc system
Slideshow


Froth paks used extensively in cold room construction. Light portable ideal sealant when fitting new build sprinkler systems ect , and will also keep building air tight.
These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations

Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
Technical Data
Customer comments
Mr G Stibbs -
Warwickshire.
“Thanks Mike and Lee, sorry to be a pain but thanks for your support on the phone, sprayed all three containers in one afternoon with one kit, no more condensation, you were right 10-15mm applied problem solved “
Mr A Wilkins. -
Surrey 03/03/10
“Thanks EPS for the professional service I received from yourselves, the condensation problems I had on my steel outbuilding have stopped, can’t believe that four of your foam kits solved all my problems, I should have called you years ago, and the contractors you recommended, were very professional and did exactly as you said they would, please pass my comments on the guys. Not having to do it myself was a benefit, but having watched them, I’m sure I would have been fine, the kits are a very simple system to apply”
Mr Antony Dudley -
Nether Whitaker 10/06/09
“ I had a serious problem with my slate roofs on barns and out buildings , slate slippage through nail fatigue, since the buildings were just storage and open buildings re roofing was just too expensive on my budget, I tried one kit which you recommended this was delivered promptly as promised, and unlike other sites the yield figures quoted were spot on, also the technical back up provided was invaluable, especially with prep required to roof prior to application of foam , 5 kits later all barns secure and savings me many £1000s Thank you EPS“
Mr L. Belt - Nottingham 18/06/2011
“ I purchased a kit to insulate my narrowboat as I was let down by local contractor last minute , glad I did, this meant that I was in charge of the application , minimum in engine bay to stop condensation, but thicker on cabin and lounge, trimming was minimal compared to the boat I had done ten years ago cheers”
Eco Polyurethane Systems Ltd
Address: Unit 59, Kepler, Lichfield Road Industrial Estate, Tamworth, Staffordshire B79 7XE
Telephone: 0800 38 78 77
Int Tel. +44(0) 1827 313951
FAX: 01827 54683
E-mail: info@eps-systemsltd.com