Froth Pak

/The FROTH-PAK kit comprises two pressurised tanks, linked by hoses, to a dispensing gun. When the contents of the two tanks are dispensed, they chemically react to produce a froth-like substance, which quickly expands to about three to five times the dispensed volume. The foam solidifies in about 60 seconds and fully cures into a solid permanent structure in approximately five minutes. Cured foam resists moisture, insulates, dampens noise, adds structural support, provides an air-seal and fills voids.

Froth-Pak is the best form of insulation available, because of its closed compact cellular structure.

Spray Froth-Pak onto any clean, dry surface in any direction to insulate, fill and seal various size voids, dampen sound or reduce vibration. It is specifically designed to spray onto flat or irregular surfaces, and to fill large cavities.

"Don’t want to spray it yourself then call us and we can arrange a contractor to apply your foam for you"

The Froth Paks are a great fire rated portable product, they are self pressurised and give machine quality closed cell spray foam.  Ideal for any of your sprayfoam requirements. The kits come in various sizes, FP180 and the FP600. Using the Patented GHA applicator guns things could not be any simpler.   Kits and lines are colour coded simply connect gun kit to the tanks, click in an anti crossover nozzle and create foam, spray, inject, glue or bond. Perfect for all applications and with the Froth Pak spray foam kits you are ensured perfect quality closed cell foam time after time. Minimal mess no contractors required and with the larger FP600 creating up to 50 Sq mtrs @ 25mm thick, larger jobs can be completed easily.

USES     

  • Insulation
  • Spray foam insulation
  • Under roof spray / sprayed on to membranes and direct onto prepared tiles
  • Roof consolidation / Used as a replacement for cement torching to prevent tile and slate loss
  • Condensation abatement  / 15mm of foam onto corrugation stops condensation forming
  • Marine insulation / Buoyancy
  • Film and set construction
  • Air-seal  / Building air tightness   
  • Pipeline / Gas and oil industry
  • Cold storage
FP180 Kit FP 600 Tank GHA 9 Gun Kit

FP180 QR.
Contains two tanks A component / B component.
Weight 17 KG
B2 Fire rated
Density 28-30KG
Coverage 15-18 sq mtrs @ 25mm
Cure time 45-60 seconds.

Downloads
FP180 A QR Safety Data Sheet
FP180 B QR Safety Data Sheet

FP600 QR.
Contains two tanks A component and B component
Weight 50KG
B2 Fire rated
Density 28-30 KG
Coverage 55-60sq mtrs @ 25mm thick
Cure time 45-60 seconds
FP600 tank sets available in slow rise formulation same as above but cure time is 90 seconds, suitable for void filling ect.

Downloads
FP600 A QR Safety Data Sheet
FP600 A&B Safety Data Sheet
FP600 B Safety Data Sheet

GHA9 Gun kit.
Contains wrench 9ft hose, applicator gun petroleum jelly and 10 NS nozzles.

 

GHA 15 Kit / Manual Valve Sets

GHA15 Gun kit.
Contains wrench 15 ft hose, applicator gun petroleum jelly and 10 NS nozzles.

GHA30 Gun kit.
Contains wrench 30ft hose , applicator gun petroleum jelly and 10 NS nozzles.

Manual transfer valves.
Contains two colour coded manual valves for use with multiple kits, the valves are designed to make multi gun use simple. However the gun kits themselves are designed to be disposable and will wear over use but 4-5 kits per gun can be achievable if tolls are looked after.

NS Nozzles
The clear/white nozzle gives spray finish ideal in most applications.
GG Nozzles
White/ blue nozzle gives fine fan pattern suitable for larger flat areas, steel containers, sarking, boarding ect.

Caulk and pour nozzles available on request.

Yield

Yield stats for Froth Pak

Downloads:
For a larger version of the yield stats above and more detailed information regarding Froth Pak please see our Froth Pak brochure click here to download

For full instructions please download Froth Pak Instructions here

For quotation and supply contact Eco Polyurethane Systems Ltd. on 0800 38 78 77

 

 

Froth Pak - Videos

More Videos for Froth Pak

Froth Pak roof Insulation

Spray foam kit/ Condensation problems solved

Froth pak used on GRP Dormas

Storage Container Insulation/Condensation cure

Spray foam as a roofloc system

Floor / Basement insulation

Slideshow

  • Froth Pak
  • Caulk Nozzles
  • FP180 Tank
  • FP600 Tank Set
  • GG Nozzles
  • GHA15
  • GHA9
  • Manual Valves
  • NS Nozzles
  • Froth Pak
  • Froth Pak
    Froth paks used extensively in cold room construction. Light portable ideal sealant when fitting new build sprinkler systems ect , and will also keep building air tight.
  • Froth Pak
    These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
  • Froth Pak
    These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
  • Froth Pak
    These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
  • Froth Pak
    These pictures show how 10-15mm of Froth pak foam was applied to solve condensation problems on storage shed . Application took 5 days and 25 kits to cover 2000 sq mtrs
  • Froth Pak
    These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
  • Froth Pak
    These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
  • Froth Pak
    These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
  • Froth Pak
    These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
  • Froth Pak
    These images shows how froth pak can be used on GRP dormas , stopping condensation but also insulation to current building regulations
  • Froth Pak
  • Froth Pak
  • Froth Pak
  • Froth Pak
  • Froth Pak
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of slate roof that was suffering from slate slippage due to mechanical fixings clips and nails corroding. This had a annual roof repair bill of 4-500 euros, plus minor repairs after storms . The cost to re roof this project was 18000.00 euros inc labour and scaffolding and work would take 10-12 days. Our solution was to repair the roof replace broken slates and re align all slipped slates, this was carried out in the summer cost so far scaffolding 1200 labour 2 days. We then used our high density foam kit and applied a 10mm thick pass just on to the rear of the slates, leaving air flow at the eves and also leaving face of lathes open also, the foam was acting as a tile lock similar to the old version of a line torching which used to be applied by hand and was very labour intensive. The outcome we used 4 X 600 foam kits and bonded roof in four hours, cost of materials then was £1500.00. So even with exchange rates the saving was over 14000 euros. The work was completed 4 years ago , and how many slates missing since then = Zero. Maintenance free roofing all that requires attention is cleaning gutters, and chimney flashings are externally fixed that may fail in the future.
  • Roof Project
    Images of finished spray on barn project
  • Roof Project
    Images of finished spray on barn project
  • Roof Project
    Images of finished spray on barn project
  • Roof Project
    Images of finished spray on barn project
  • Roof Project
    Images of finished spray on barn project
  • Roof Project
    Images of finished spray on barn project
  • Roof Project
    Images of finished spray on barn project
 
Now Loading

Technical Data

Click here for technical data

Customer comments

Mr G Stibbs - Warwickshire.
“Thanks Mike and Lee, sorry to be a pain but thanks for your support on the phone, sprayed all three containers in one afternoon with one kit, no more condensation, you were right 10-15mm applied problem solved “

Mr  A Wilkins. - Surrey 03/03/10
“Thanks EPS for the professional service I received from yourselves, the condensation problems I had on my steel outbuilding have stopped, can’t believe that four of your foam kits solved all my problems, I should have called you years ago, and the contractors you recommended, were very professional and did exactly as you said they would, please pass my comments on the guys. Not having to do it myself was a benefit, but having watched them, I’m sure I would have been fine, the kits are a very simple system to apply”      

Mr Antony Dudley - Nether Whitaker  10/06/09
“ I had a serious problem with my slate roofs on barns and out buildings , slate slippage through nail fatigue, since the buildings were just storage and open buildings re roofing was just too expensive on my budget, I tried one kit which you recommended this was delivered promptly as promised, and unlike other sites the yield figures quoted were spot on, also the technical back up provided was invaluable, especially with prep required to roof prior to application of foam , 5 kits later all barns secure and savings me many £1000s  Thank you EPS“

Mr L. Belt - Nottingham 18/06/2011

“ I purchased a kit to insulate my narrowboat as I was let down by local contractor last minute , glad I did, this meant that I was in charge of the application , minimum in engine bay to stop condensation, but thicker on cabin and lounge, trimming was minimal compared to the boat I had done ten years ago cheers”

 

 

 

 

Latest News

Keep checking back for all the latest news from EPS

Eco Polyurethane Systems Ltd

Address: Unit 59, Kepler, Lichfield Road Industrial Estate, Tamworth, Staffordshire B79 7XE
Telephone: 0800 38 78 77
Int Tel. +44(0) 1827 313951
FAX: 01827 54683
E-mail: info@eps-systemsltd.com

ISO Registered Company